When considering whether or not to invest in an energy project, the potential for long-term profit is an important factor to consider. To acquire an answer to this issue, the levelized cost of energy (LCOE) must be determined. The LCOE method considers not only the original investment, but also the continuing costs connected with a project.
Table of Contents
What is LCOE ( Levelized Cost of Energy )?
Over the course of a photovoltaic system’s lifespan, the cost of the energy it generates is measured by its levelized cost of energy (LCOE). In the age of grid parity for renewable energy, this is a crucial consideration. LCOE was created to serve as a timer until renewables could stand on their own in merchant markets.
Simply said, the better your system is as a whole, the lower your levelized cost of energy (LCOE) will be.
What does LCOE ( Levelized Cost of Energy ) do?
Comparison indicator for investors
Strategic decisions, both large and little, can be informed by LCOE analyses. LCOE is a deciding factor for investors because it serves as a comparison indicator. Investors are asked to provide solutions to a wide range of challenging questions. They have to make a lot of decisions, and one of them is whether to use high-quality, cutting-edge technology products or cheaper equivalents. They can use LCOE as a deciding factor.
Indicator of minimum revenues
An investor or developer must first establish a project’s viability during the early appraisal phase. Second, it helps you estimate how much money you’ll need to make back on your investment. Therefore, it serves as a high-level overview of the necessary sales strategy.
Indicator of the costs of different generation technologies
LCOE assists in comparing projects and energy sources to determine which are the most cost-effective.The calculation allows project developers and financiers to assess generation options such as solar, wind, nuclear, gas, and coal while accounting for project lifespans, capital costs, fuel costs, capacity size, and risk.
It gives policymakers a global perspective on the relative costs of different technologies of generation. Subsidy allocation decisions necessitate this sort of analysis. For instance, governments invested heavily in renewable energy technology while LCOE prices were high, with the end purpose of facilitating the development of specialised technologies.
How to calculate LCOE ( Levelized Cost of Energy ) ?
To calculate LCOE, we add up the capital expenditures and operating expenditures of the plant, divide its acquired energy production over its expected lifetime.
CAPEX, also known as capital expenditure, refers to the initial investment required for a solar system, encompassing the expenses associated with components, labor, and other supplementary expenditures.
Operating expenditures, sometimes referred to as OPEX, encompass various costs associated with the day-to-day operations of a business. These costs typically include expenses related to utilization, maintenance, taxes, and other similar expenditures.
Acquired energy production (AEP) refers to the quantity of energy that a system is able to collect and utilize during its operational lifespan.
All necessary components, such as the initial investment, continuing maintenance, and petrol, will be included in the total price. The discount rate, as well as any applicable subsidies or tax breaks, will be considered. In this sense, “output” refers to the total amount of electricity that the plant is expected to produce. A solar energy system typically has a functional life of 25-30 years.
A typical levelized cost of electricity for a solar photovoltaic system would look like this:
Initial capital cost: $65,000
Tax credit: $12,000
O&M: $6,000
Total cost: $59,000
Average annual electricity production: 62,500kWh
PV equipment warranty period: 30 years
Total electricity production: 1,875,000kWh
LCOE: $59,000 / 1,875,000 = $0.03147/kWh
Profitability depends on selling the generated electricity for greater than $0.03147/kWh. However, if the price of power is lower than $0.03147/kWh, the project will incur a loss over its 30-year lifespan.
Comparison of solar energy’s LCOE ( Levelized Cost of Energy ) and others
When compared to alternative energy sources like wind, coal, and gas, the levelized cost of electricity (LCOE) from utility-scale PV is already competitive.This points to continued and healthy expansion in the PV business.
In 2021, the LCOE range for utility-scale PV was quite narrow, falling between $30/MWh and $41/MWh. It was between $24/MWh to $96/MWh in 2023. Even with the rise, the LCOE is still the lowest of all comparable options. Gas peaking costs between $115 and $221 per megawatt-hour, nuclear between $141 and $221 per megawatt-hour, coal between $68 and $166 per megawatt-hour, and gas combined cycle between $39 and $101 per megawatt-hour, as reported by Lazard.
So, what does this LCOE stand for? That means that gas and coal plants must charge more for power than solar and wind farms in order to make a profit.
The cost of gas, coal, or nuclear fuel, as well as the cost of operations and maintenance (O&M), are important determinants of the overall cost of traditional fossil fuel and nuclear power plants. Renewable energy systems provide lower operating and maintenance costs in addition to saving money on petrol. Renewable energy systems have no fixed costs because the sun and wind are free. The cost of solar maintenance has decreased in recent years as a result of developments in inverter reliability, remote monitoring technology, and cleaner solar panels.
Oil and petrol costs have risen as a result of the current energy crisis, making renewables even more competitive in terms of LCOE. The levelized cost of energy (LCOE) for fossil-fuel power plants has risen, while the LCOE for renewable energy has stayed consistent. As a result, renewable energy generators benefit more from rising power rates than fossil fuel generators, who must also account for rising fuel costs.
All in all, the levelized cost of electricity (LCOE) serves as a crucial metric for evaluating the financial feasibility of a photovoltaic (PV) system and assessing the effective integration of its individual components. Nevertheless, the limitations of Levelized Cost of Electricity (LCOE) necessitate caution in relying solely on this metric for investment decision-making.
Since 2008, Maysun Solar has focused on creating premium photovoltaic modules. Choose from our extensive selection of solar panels that use half-cut, MBB, IBC, and Shingled technologies in full black, black frame, silver, and glass-glass finishes. These panels provide exceptional performance and fashionable designs that easily fit into any building. In several nations, Maysun Solar has developed offices, warehouses, and enduring partnerships with top installers. If you have any questions about PV or would want the most recent module quotes, please contact us. We are eager to help you.
Reference:
Solarity. (2022, April 7).What does LCOE mean? Solarity.
Kanellakopoulou, M. (2022). Levelised Cost of Energy (LCOE) – An overview. Pexapark.
Santos, B. (2023, April 14). Average solar LCOE increases for first time this year. Pv Magazine International.
Rodríguez, L. (2022, August 17). What is LCOE and why is it important?

How to Size a Commercial Rooftop Solar System: A Practical Guide for EPCs
For commercial and industrial (C&I) rooftop solar projects, the maximum number of panels a roof can accommodate does not necessarily determine the most suitable system size. A factory may have sufficient roof space for a large PV installation, but its electricity consumption, grid

5400 Pa Snow Load: How to Choose PV Modules with 30 mm or 35 mm Frames
For PV projects in Alpine and other high-snow-load regions in Europe, selecting a module based only on a “5400 Pa” rating or a 30 mm vs 35 mm frame height is not enough. A more reliable approach is to first determine the project-specific snow load

Carbon Footprint and LCA in European C&I Solar: Why EPCs Should Check Before Module Procurement
Solar power is widely regarded as a low-carbon energy source. However, generating electricity from solar energy and manufacturing a low-carbon solar module are not quite the same thing. Before a photovoltaic module leaves the factory, it passes through multiple manufacturing stages, including silicon

HEMS and Dynamic Electricity Pricing: From Solar Generation to Smart Energy Management
For years, home solar systems have focused on one main question: How much electricity can my rooftop solar system generate? But as home batteries, smart meters, electric vehicles and flexible electricity tariffs become more common, residential energy management is entering a new phase.

Maysun Solar’s First 3.5 MW Solar EPC Project in Italy Enters Its Final Stage
A large-scale commercial and industrial rooftop solar project with a total capacity of approximately 3.5 MWp is now entering its final stage in the Turin area of Piedmont, Italy. Around 8,000 solar modules planned for the project have now been fully installed.

August European Solar Industry News
In August 2026, Europe’s solar market combined record PV generation with volatile power prices driven by heat, gas costs and low wind output. Policy support also expanded, including 800 W plug-in solar in Great Britain and greater EU flexibility for PV and storage investments, while module prices largely stabilized amid renewed oversupply.